Provided Field Inspections and Legal Description to the City of Carson for street improvements along 168th Street and Main Street.
Performed Construction Staking inspections from Imperial Highway to Weir Canyon Road.
Used GPS Survey equipment to obtain Zone 5 coordinates of the project site and for monitoring wells. Conducted Location Survey.
Evaluate location of stockpile boundaries for probable grades before stockpiles occur.
L.I.D. and Natural Infiltration Feasibility Study to solve a nuisance ponding and drainage problem.
Topographic Survey for a repavement project at the Southern California Edison Facility.
SWPPP
Construction Staking Survey for: construction of a new northbound on-ramp, bridge expansion on 223rd Street and road widening on Wilmington Blvd and 223rd Street.