Precise Grading and Drainage Plan, Erosion Control Plan, SUSMP Plan and Boundary and Topographic Survey).
Grading and Drainage Plan, Utility Plan, Street Improvement Plan, Street Lighting Plan, SWPPP Plan and Boundary and Topographic Survey to support construction of this fire station.
Grading and Drainage Plan, Utility Plan, SWPPP Plan and Boundary and Topographic Survey to support construction of this fire station.
Grading and Drainage Plan, Utility Plan, SUSMP Plan, SWPPP Plan, WWECP Plan, Street Improvement Plan, L.I.D. Plan and Boundary and Topographic Survey to support construction of this fire station.
Grading and Drainage Plan, Utility Plan, Street Improvement Plan and Boundary and Topographic Survey with Record of Survey to support construction of this fire station.
Prepared Sewer Area Study and Street Lighting Plan for a street light on Dolores Street. Designed Street Improvement Plan for the driveway and sidewalk. Scope of work also included Boundary and Topographic Survey with Record of Survey, Construction Staking Survey and Legal Description for Street Dedication.
Grading and Drainage Plan, L.I.D. Plan, SUSMP Plan and Boundary and Topographic Survey for proposed new building and parking lot.
Boundary and Topographic Survey, Precise Grading and Drainage with SUSMP, Lot Merger, Public Works Plan and Construction Staking to support Construction of new buildings and site improvements to the east parking lot.
Driveway Plan, Partial Precise Grading and Drainage Plan, Erosion Control Plan, SUSMP Plan, Boundary and Topographic Survey and Lot Merger to support driveway access on 219th Street and additional parking.
Construction Staking Survey, Partial Topographic Survey and As-Built Survey for installation of a new scoreboard.
Provided Grading and Drainage Plan, Erosion Control Plan, SUSMP Plan and Topographic Survey to the City of Carson for athletic field renovation. The purpose of this renovation is to grade the athletic field for proper drainage, remove and reconstruct the irrigation system, install new fence, and construct a retaining wall along 223rd Street.